Construction phase plan guide
What a construction phase plan is, when it is required, who prepares it and what it should contain.
Free CDM template
Download an editable Word template to help you create a project-specific Construction Phase Plan for CDM 2015 projects, with structured sections, guidance and worked examples.
Free, No sign-up required, Editable .docx



The template is organised into 17 sections, from document control to the site induction record. Each section explains what to include and shows a completed example.
Description of the works, address, programme, working hours, F10 notification check and document control.
Client, designers, Principal Designer, Principal Contractor and contractors, plus key site contacts.
Cooperation and coordination, worker consultation, exchange of design information and the right to stop work.
Project-specific site rules, an induction content checklist and who delivers inductions.
Toilets, washing, drinking water and rest areas, first aiders and first-aid kit locations.
Raising the alarm, assembly point, emergency contacts, accident recording and RIDDOR reporting.
Key hazards and control measures, vehicle and pedestrian segregation, deliveries and highway works.
RAMS submission, review and register, plus waste, dust, noise and pollution controls.
Inspection schedule, when to review the plan, plan sign-off and a site induction record.
Guidance where you need it. Blank fields where you don’t.
These are real pages from the Word template. Blue guidance boxes explain what each section needs, example boxes show a completed answer, and the tables are ready to fill in.




Swipe to see more pages.
Anyone preparing or maintaining a Construction Phase Plan can use it. It is written with these readers in mind.
Create and maintain a project-specific Construction Phase Plan for construction work you manage or carry out.
Use the template to structure the arrangements for planning, managing, monitoring and coordinating the construction phase.
Use the guidance and prompts to build a proportionate plan around the way your project will actually run.
A Construction Phase Plan is required for every project involving construction work under CDM 2015. It must be prepared before the construction phase begins, whatever the size of the project and whether or not it is notifiable to HSE.
Once work starts, the plan must be kept under review and revised as the project or its risks change.
Read our plain-English guide to Construction Phase PlansGet the editable Word template instantly.
Replace the prompts and examples with project-specific information, risks and arrangements.
Keep the plan under review and revise it as the project or risks change.
Yes. The template is free to download, with no sign-up and no email address needed. Select Download editable Word template and the file downloads straight away.
Yes. It is supplied as an editable Word document (.docx), so you can replace the prompts and examples, add rows and adjust sections to suit your project. It should also open in other software that supports .docx files, although formatting may vary.
Yes. Under CDM 2015, a Construction Phase Plan is required for every project involving construction work, whatever its size and whether or not it is notifiable to HSE. It must be prepared before the construction phase begins.
Where there is only one contractor, that contractor draws up the plan or arranges for it to be drawn up. Where there is more than one contractor, the Principal Contractor does so. The client must ensure a plan is drawn up before the construction phase begins. The CDM Duty Holder Checker can help you work out which roles apply.
Yes. A single-contractor project still needs a Construction Phase Plan. Keep it proportionate: a short, straightforward job may only need brief entries, but the arrangements the work actually needs should still be covered.
Yes, where the work is a construction project under CDM 2015. The template’s worked examples are based on a domestic extension. The domestic client arrangements change who carries out the client duties, not who prepares the plan: that is still the contractor, or the Principal Contractor where there is more than one contractor.
Yes. Adapt the template to the way your project will actually run. Where an optional prompt genuinely does not apply, mark it N/A or remove it. Do not leave out arrangements the project needs, such as site rules, welfare or emergency arrangements, simply because the project is small.
No. The template is a framework for recording your arrangements. Compliance depends on those arrangements being suitable for the work and put into practice, and on the plan being reviewed and revised as the project changes. The template is not legal advice.
No. Aptoris is independent, and this template is not produced, approved or endorsed by HSE. HSE publishes its own guidance on construction phase plans, including CIS80 (opens in a new tab). For authoritative requirements, refer to CDM 2015 and current HSE guidance.
Guides and free tools to help you prepare the plan.
What a construction phase plan is, when it is required, who prepares it and what it should contain.
Check which CDM 2015 roles apply to your project, including whether a Principal Contractor is needed.
Guidance only. Not legal advice or a definitive compliance determination.
Check whether your project is likely to be notifiable to HSE before you complete the project information.
Guidance only. Not legal advice or a definitive compliance determination.
Planning, managing, monitoring and coordinating the construction phase on multi-contractor projects.
What a site-specific induction should cover and how it links to the construction phase plan.
Answer a few questions about your project to see whether CDM 2015 is likely to apply.
Guidance only. Not legal advice or a definitive compliance determination.
Download the editable Word template and create a project-specific CPP for your construction project.
Free, No sign-up required, Editable .docx